Framework (3)

The last two floor battens have been fitted. The fwd ends of these battens still need to be trimmed and shaped. The sheer clamps are next, but I will have to make up the required lengths first. I could only get 3.6 m sticks of 42 x 19 mm softwood (pine). I also started the time-consuming task of fairing this collection of frames and sticks.

Framework_10

Framework_11