Rub rails and a bit of glass

I attached the ‘first instalment’ of the rub rails on both sides. These rails will be growing a bit over the next few days as additional strips of timber are glued on. The second task was to glass the outsides of the top panels forward of the cabin. The fabric extends to the inboard edges of the sheer-clamps.

IMG_0739IMG_0740