Cabin progress

The framework for the seat-backs is all squared up and waterproofed – ready for the foam to go in and the panels to be installed. I also drilled holes for drain plugs on both sides into the seat-back supports at station 8. Not that there should be any water ever, but at least it is possible to check that there really isn’t …

All the fillets in the cabin are now in place and the seam between the side panels is taped. The first of the curved cleats that will carry the cabin roof is also glued in. These cleats are cut with the jig-saw from 3/4″  Tasmanian Oak.

IMG_0689IMG_0690IMG_0693