Watching paint dry

After many short sessions, the floor boards are finished, and the bottom panels have their second lot of top coat. The floor boards took a lot of time to coat with PU … the undersides and the edges have two coats, while the top has three coats. It took many hours for things to dry between applying each coat and  before turning the boards over.

The bottom panels had two coats of primer and a quick sanding with #240. Then I applied two coats of oil based enamel ( off-white ) with a light sanding  in between applying the top coats.

The next job will be the screwing down of the floor boards back into the boat.